Solar panels on a tiled roof in Brakpan
C&I Solar & Storage

7.4 kWp of rooftop solar and 20 kWh of storage in Brakpan

Small site · Brakpan, GautengCompleted

Impact

Grid independence
80%
Share of the site's energy supplied by solar since commissioning
Uptime
100%
No loss of supply since commissioning

The site in photos

A Brakpan property now runs on a 7.4 kWp rooftop solar array, a 10.5 kW WEG hybrid inverter and 20 kWh of battery storage. The system was designed to cut how much power is bought from the grid at Ekurhuleni tariff rates. It now supplies 80% of the site's energy and has run with 100% uptime since it went live.

Project facts

Site
Small site
Location
Brakpan, Gauteng
Solar PV Capacity
7.4 kWp
Battery Energy Storage Capacity
20 kWh
All project facts

Project

Status
Completed

Equipment

Inverter
WEG 10.5 kW hybrid inverter, 1 unit
Battery
WEG 10 kWh battery module (20 kWh total), 2 units

The challenge

Grid power at municipal rates, used when the sun is down

This site's demand runs against the solar curve. It is lightest in the middle of the day, when panels produce most, and heaviest in the early morning and evening, when they produce little or nothing.

The property buys its electricity from the City of Ekurhuleni, so every kWh drawn from the grid is billed at the municipal tariff. The goal was to reduce that exposure as far as the roof and budget allowed. Panels alone would not do it: they would cover the quiet middle of the day and leave the site on the grid for the mornings and evenings.

Our solution

Solar by day, battery by night

The 7.4 kWp array is split across two roof faces and feeds a single 10.5 kW WEG hybrid inverter. Two 10 kWh WEG battery modules give 20 kWh of storage.

During the day, solar runs the building and charges the battery. In the evening and overnight the battery takes over, and the grid only tops up what is left. If the grid drops, the inverter carries the building on battery and solar without a break.

The inverter is rated above the array. That headroom lets it carry the site's load during an outage and leaves room to add panels later.

The outcome

80% grid independence, 100% uptime

Since it went live, the system has supplied 80% of the site's energy. The grid now covers the remaining 20%.

Uptime has been 100%. The site has not lost power since commissioning.